According to a survey, 77% of construction project faces delay right from the day it starts. A project has to face minor and major pitfalls. Despite several opportunities in the industry, it is hit with different challenges that needs solution. Whether it’s the availability of construction equipment like the high capacity telehandler or labor shortage, these issues are common on every construction site.
The growing number of contractors have lots of expectations from the upcoming year, as the covid pandemic has made the industry suffer in many terms. No matter how promising the outlook is, here are some common issues that every construction project and contractor deals with throughout the completion of the project.
Limited Skills:
The construction industry needs skilled laborers. It is one of the biggest requirements of present times. There are a smaller number of graduates who choose this industry and show their interest in such engineering. As a result, there is always a dearth of skilled labors or even freshers (after training) who can handle and manage the industry tactics and moves easily.
Lack of Communication:
There are no set guidelines or a common hierarchy to communicate any issues to the lower or upper level. It is the major reason why any small or negligible issue becomes huge and unmanageable after some time. Also, proper communication management is needed when the entire work is delegated to several teams. Any lack of communication affects the entire procedure.
Lack of Productivity:
Poor productivity is another issue that can occur due to various reasons like:
- Lots of idle time due to late or insufficient supply of materials
- Construction vehicles breaking down and delay in arranging for the new one
- Frequent weather changes that do not support construction activities
- Any serious design complication that arises in the midway
- Friction between the different stakeholders (e.g., owner and contractor)
Insufficient Supply and Rising Cost of Materials:
There are chances when the project faces a lack of raw materials or insufficient supply for materials that delays the work. Certain amendments in the government rules for the construction industry also affect such supplies. Also, the rising cost of the materials is another issue. Construction projects also face financial issues at many stages that delay the supply of raw materials due to their high costs.
Poor Contractor Performance:
The combination of volatile issues like lack of raw materials, government regulations, and poor productivity, hampers the overall performance of the contractor in project. This increases the probability to delay the project being completed on time. Moreover, lack of budget acts as a catalyst in contractor’s poor performance.
Any contractor/owner can overcome these issues with proper planning, management and adequate resources. Dieci Ontario is one of the leading companies to providing construction equipment. If you need high capacity telehandler or any other efficient equipment, then, call us at 1-833-743-2500 or write to us at info@dieciontario.ca. Our representatives will connect with you to know and process your requirement.